Scott and I took our almost daily trip out to the new house today. So far, we have moved a lot of boxes to the basement, a couch, bed, 2 bookcases, 1 roll-top desk/hutch, and coffee table upstairs. The upstairs is almost finished, with only two lights and two mirrors to put in. The entryway tile needs installed, as well as the backsplash and fireplace tile. The lights should arrive this week, then the outside siding and concrete work is left to finish. We WILL be in the house by April 30th, even if the exterior is not finished. Enjoy the not-yet finished product.
Tile in Shower

Island

Fireplace cabinets and mantel..with no tile yet : (

Kitchen cabinets (range hood still needs to be installed)

More Kitchen cabinets

"Amazon Black" Granite and stovetop
The house looks awesome!! Yeah for becoming a homeowner!!
ReplyDelete